Here we go again...
On Monday and Tuesday we went to measure up the Atlantic Centre in town, which is right at the Thomas
Platulo building. The engineers want to know where the concrete framed structure lies and where the grid lines are... its gonna take a while......
On Wednesday, i had to do changes on plans for a house that is currently being built. so i must just keep the plan up to date because they are changing things on sight.
On Thursday i Placed 32 Low cost housing on their own sights with all the info and started making changes on the Caledon low cost housing units.
And today we went to take a few check measurements at the Atlantic Centre and i got to demolish suspended ceilings and doors to find out where the beams run, which was AWESOME.
Friday, July 29, 2011
Friday, July 22, 2011
Week 27
Well this week went nice an short.
All i did this week was, work on different options and materials for the 3D drawing im working on,
Converted an AutoCAD drawing to Caddie so that all the layers and line weights are right,
We went to measure up the outside area of an existing house for extentinons and
started the working drawings on the Demnitz project of which the client has made up his mind on an option with a few alterations.
:) Awesome week
All i did this week was, work on different options and materials for the 3D drawing im working on,
Converted an AutoCAD drawing to Caddie so that all the layers and line weights are right,
We went to measure up the outside area of an existing house for extentinons and
started the working drawings on the Demnitz project of which the client has made up his mind on an option with a few alterations.
:) Awesome week
Tuesday, July 19, 2011
Week 26
This week i did alterations on 14 different low cost housing units. The only thing i don't like about it is that i cant add it into my portfolio work.
I also worked on a site layout for a site that we will probably go and measure next week.
There were a few amendments that needed to be done on one of the older projects which i did.
I have made changes to the Meerlust project plans ( 3D project) so now I've been working on the changes on the 3D model which takes quite a bit longer to do...
Sedick is a guy that walks plans through council for my boss. I had to do quite large changes on house plans for his own house. It's quite a process, because he wants to sub-divide his site and it has a future road widening restriction, which i find very interesting so I'm going to follow up on that project.
other than that, work has picked up in the office again, which is great.
I'm just a little worried and confused about my collage work now...
I also worked on a site layout for a site that we will probably go and measure next week.
There were a few amendments that needed to be done on one of the older projects which i did.
I have made changes to the Meerlust project plans ( 3D project) so now I've been working on the changes on the 3D model which takes quite a bit longer to do...
Sedick is a guy that walks plans through council for my boss. I had to do quite large changes on house plans for his own house. It's quite a process, because he wants to sub-divide his site and it has a future road widening restriction, which i find very interesting so I'm going to follow up on that project.
other than that, work has picked up in the office again, which is great.
I'm just a little worried and confused about my collage work now...
Tuesday, July 12, 2011
Week 25
Hmmm, cant wait to go on my little holiday :).
I've been so busy again....
This week I finished the huge internal/external 3D drawing but there is already alterations so I'm going to have to change a few things.
I also finished the 3D alterations on a different project. My boss says that the client loves it :).
I've also been doing a lot of admin in the office with regards to advertising and personal letters.
We went to do some check measurements on PEP stores in town, apparently they were not happy with the square metreage that was previously measured. Turns out there's quite a large area that they are not using...
Till next week :)
I've been so busy again....
This week I finished the huge internal/external 3D drawing but there is already alterations so I'm going to have to change a few things.
I also finished the 3D alterations on a different project. My boss says that the client loves it :).
I've also been doing a lot of admin in the office with regards to advertising and personal letters.
We went to do some check measurements on PEP stores in town, apparently they were not happy with the square metreage that was previously measured. Turns out there's quite a large area that they are not using...
Till next week :)
Monday, July 4, 2011
Week 24
Well his should be a quick one short one.........
The only thing i have worked on in the past week is an extremely detailed 3D sketch-up drawing which i did mention last week.
In my own time I have also completed a little private job. It is just placing a 3x9m Wendy-house on a site but it has a bathroom in it so council requires the same drawings as a permanent structure. This includes Plan, Site plan, 1 x Section and 4 x Elevations.
And that was my week...
The only thing i have worked on in the past week is an extremely detailed 3D sketch-up drawing which i did mention last week.
In my own time I have also completed a little private job. It is just placing a 3x9m Wendy-house on a site but it has a bathroom in it so council requires the same drawings as a permanent structure. This includes Plan, Site plan, 1 x Section and 4 x Elevations.
And that was my week...