Friday, August 5, 2011

Week 29

This whole week was spent on measuring up the Atlantic Center in town and I'm busy drawing the sections at the same time while my colleague is working on the plans.

 We are working with the engineers to find out where all the concrete supports, columns and slabs are. That is where I come in lol. I have been drilling into the walls, chipping away the plaster, finding out where there are step ups and step downs of the slab in the walls, kicking doors in, breaking down the suspended ceiling and drilling through floor slabs for the thicknesses.
As well as measuring up the whole building at the same time.
I must admit, I'm having Quite a bit of fun on the project.