This week was a good quick week thanks to the long weekend and a slightly lighter work load. I completed a working drawing for a campsite braai area, washing up area and toilets. The interesting part is that it was designed in and around an old concrete dam.
Wednesday I completed a set of working drawings for a odd shaped 66m² carport which was an extension to a house.
Yesterday was the most enjoyably work day though, because my boss allowed me to design and draw up braai areas for the campsite i worked on, on Tuesday. I had to design and position them on the sites and organize the rest of the individual site layouts. I also got to work on my sketch-up drawing for the Hoyle project.
I'm really stressed about the collage work now though because it is so unclear and in my opinion it is being communicated through to many different websites. it takes an hour just to go through everything to check for new posts every day.