Week 31

I was actually glad to be back at work to finish off the Atlantic centre project. The whole week just consisted of going to measure the building every 2nd day and drawing up the building every other day. We luckily ran into the elevator maintenance guy, so I got to ride on top of the all the lifts. It was extremely helpful because, I could pick up all the beam and column thicknesses inside the lift shafts but I found it really strange that the refuse lift shaft was plastered and painted on the first 3 floors. I did allot of drilling and check measurements as the project was coming to an end. The sorting out of all the loose ends and nitty-gritties is very tedious.